STEGRA Steel Mill Project – Stockholm, Sweden

Stegra Project
STEGRA EPC Project – Stockholm, Sweden

Project Overview

We worked alongside AFRY Industry AB to support commercial and design coordination on the delivery of a £3.5 billion advanced manufacturing EPC project for STEGRA in Sweden.

Implementation

May 2023

Daniel Ginn

Daniel Ginn

Project Lead, Procurement Strategy

Adersh Raj

Commercial Manager

Challenge

Balancing design change with commercial discipline

The STEGRA EPC project involved complex design packages, process plant coordination, and engineering integration across multiple contractors and countries. With evolving design requirements and high-value contract packages, AFRY required commercial support that could keep pace with scope evolution and maintain control of budget drift.

Ginjo was engaged to bring structured variation control and commercial clarity to the design process – bridging the gap between engineering changes and contract administration.

Solution

Design-integrated commercial tracking

Ginjo embedded into AFRY’s delivery team to track change events, structure variation workflows, and support contractor evaluations. We reviewed the commercial impact of engineering changes in real time and applied transparent cost control through live dashboards and structured templates.

This ensured variation approvals, payment applications, and final account positions were always backed by verified commercial logic.

Results

Commercial control across evolving scope

  • Reduction in variation approval times

  • Improved integration between commercial and design teams

  • Scope changes tracked and defended in real time

  • Client confidence strengthened through audit-ready reports